[MassHistPres] Time to move a historic structure

cvwtc at aol.com cvwtc at aol.com
Thu Feb 14 10:47:17 EST 2019


You might want to reach out to the town of Dracut.  The Fox Family Farmhouse was threatened with possible demolition but a buyer who wanted to move the structure to New Hampshire was found.  Unfortunately, the plan fell through because the utility company could not lower the telephone wires in time.  I think they said the approvals would have taken a year.  Might be worth looking into to see what you'd be up against.  Also the developer did not want to wait that long  because his financing was already in place.
Matt PujoBeverly. MA    


-----Original Message-----
From: Roughan, Michael <Michael.Roughan at hdrinc.com>
To: 'MHC list' <masshistpres at cs.umb.edu>
Sent: Thu, Feb 14, 2019 10:34 am
Subject: [MassHistPres] Time to move a historic structure

 <!-- #yiv8315145361 _filtered #yiv8315145361 {font-family:"Cambria Math";panose-1:2 4 5 3 5 4 6 3 2 4;} _filtered #yiv8315145361 {font-family:Calibri;panose-1:2 15 5 2 2 2 4 3 2 4;} _filtered #yiv8315145361 {font-family:"Arial Black";panose-1:2 11 10 4 2 1 2 2 2 4;} #yiv8315145361 #yiv8315145361 p.yiv8315145361MsoNormal, #yiv8315145361 li.yiv8315145361MsoNormal, #yiv8315145361 div.yiv8315145361MsoNormal {margin:0in;margin-bottom:.0001pt;font-size:11.0pt;font-family:"Calibri", sans-serif;} #yiv8315145361 a:link, #yiv8315145361 span.yiv8315145361MsoHyperlink {color:blue;text-decoration:underline;} #yiv8315145361 a:visited, #yiv8315145361 span.yiv8315145361MsoHyperlinkFollowed {color:purple;text-decoration:underline;} #yiv8315145361 span.yiv8315145361EmailStyle17 {font-family:"Calibri", sans-serif;color:windowtext;} #yiv8315145361 .yiv8315145361MsoChpDefault {font-family:"Calibri", sans-serif;} _filtered #yiv8315145361 {margin:1.0in 1.0in 1.0in 1.0in;} #yiv8315145361 div.yiv8315145361WordSection1 {} -->
First, let me thank all of the respondents to my request for info on streetscape. I received a wealth of information.
 
  
 
Hopkinton is attempting to extend our demo delay from 6 months to 18 months. One rationale is to have time to get a single structure historic district enabled but the second rationale is to relocate the historic structure to a different lot. We had this specific issue with a great Italianate 2 story structure that was in the way of our library expansion. We actually had a developer who was interested in buying the house ($1) and relocating it to a vacant no-conforming lot but could not get the appropriate permits in line before the delay timed out.
 
  
 
Does anyone have a timeline for a successful relocation of an historic structure they could share?
 
  
 
….Mike
 
  
 
Michael Roughan,AIA, EDAC, LEED AP, ACHA
 
Chairman - Hopkinton Historical Commission
 
  
 
Town of Hopkinton
 
18 Main Street
 
Hopkinton, MA 01748
 

D 617.357.7725M 617.784.6463


 
  
 _______________________________________________
MassHistPres mailing list
MassHistPres at cs.umb.edu
http://mailman.cs.umb.edu/listinfo/masshistpres
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.cs.umb.edu/pipermail/masshistpres/attachments/20190214/0aaa3eb1/attachment.html>


More information about the MassHistPres mailing list