Mike,
I worked on extending Newton's to 18 months while on staff there.  I found that we needed a trade off.  We took it to 18 months for buildings listed or eligible for listing (as determined by MHC) on the National Register.  Asking for every building determined preferably preserved was not going to fly.  We also loosened up the standards for partial demo allowing smaller projects to move forward without review.  The theme was catching the bigger and more important fish and letting the smaller ones go.  It still took months but did pass.

Brian LeverMedford 



-----Original Message-----
From: Roughan, Michael <Michael.Roughan at hdrinc.com>
To: Mass Historic List Serve (masshistpres at cs.umb.edu) <masshistpres at cs.umb.edu>
Sent: Mon, Jan 14, 2019 3:08 pm
Subject: [MassHistPres] Demo Delays

 <!-- #yiv1800774093 _filtered #yiv1800774093 {font-family:"Cambria Math";panose-1:2 4 5 3 5 4 6 3 2 4;} _filtered #yiv1800774093 {font-family:Calibri;panose-1:2 15 5 2 2 2 4 3 2 4;} _filtered #yiv1800774093 {font-family:"Arial Black";panose-1:2 11 10 4 2 1 2 2 2 4;} #yiv1800774093 #yiv1800774093 p.yiv1800774093MsoNormal, #yiv1800774093 li.yiv1800774093MsoNormal, #yiv1800774093 div.yiv1800774093MsoNormal {margin:0in;margin-bottom:.0001pt;font-size:11.0pt;font-family:"Calibri", sans-serif;} #yiv1800774093 a:link, #yiv1800774093 span.yiv1800774093MsoHyperlink {color:blue;text-decoration:underline;} #yiv1800774093 a:visited, #yiv1800774093 span.yiv1800774093MsoHyperlinkFollowed {color:purple;text-decoration:underline;} #yiv1800774093 span.yiv1800774093EmailStyle17 {font-family:"Calibri", sans-serif;color:windowtext;} #yiv1800774093 .yiv1800774093MsoChpDefault {font-family:"Calibri", sans-serif;} _filtered #yiv1800774093 {margin:1.0in 1.0in 1.0in 1.0in;} #yiv1800774093 div.yiv1800774093WordSection1 {} -->Thanks to the counsel of Dennis De Witt and Gretchen Schuler, the Hopkinton Historical Commission is looking to extend our Demo Delay from 6 months to 18 months. The rationale is 18 months is sufficient time to create a single structure Historic District, if that is the course Town Meeting wished to take. We have one significant property that the applicant has submitted a demolition application for, the Davis House. This structure was built in 1794 and has a long list of events that occurred on the property.    Does anyone have any information they have prepared for their Town Meeting to support a Demo Delay? What I was thinking is a list of questions i.e. Why extend the demo delay? How will it affect my property? Etc. or stories about properties lost.    Also is there a list anywhere of the Ma. towns with their current demo delay length?    Regards,     ….Mike    Michael Roughan,AIA, EDAC, LEED AP, ACHA Chairman - Hopkinton Historical Commission    Town of Hopkinton 18 Main Street Hopkinton, MA 01748 
D 617.357.7725M 617.784.6463

    _______________________________________________
MassHistPres mailing list
MassHistPres at cs.umb.edu
http://mailman.cs.umb.edu/listinfo/masshistpres
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.cs.umb.edu/pipermail/masshistpres/attachments/20190114/d1964ea7/attachment.html>


More information about the MassHistPres mailing list