[MassHistPres] Demo Delay

Brian Stripp brianchevy.71 at gmail.com
Fri May 22 16:46:39 EDT 2020


In Chelmsford we require the owner to obtain an inventory of the house
before granting the demolition

Brian Stripp
Vice Chair, Chelmsford Historical Commission

On Fri, May 22, 2020 at 2:50 PM Diane Gilbert <d.m.gilbert51 at gmail.com>
wrote:

> That seems like a slippery slope to me. Eager to see what others think.
> Diane Gilbert
> Dartmouth Historical Commission
>
> Sent from my iPhone
>
> On May 22, 2020, at 10:31 AM, Eric Dray <ericedray at gmail.com> wrote:
>
> 
>
> Hamilton is looking to update their procedure for demo delay review. A
> question has arisen about whether the Commission can require/ask the
> Building Inspector to make an assessment of a building’s condition,
> especially when an assessment has been submitted by the applicant which may
> be suspect. Do any other towns have experience with this? Does that process
> need to be embedded in the bylaw?
>
> Thank you… Eric
>
>
>
> Eric E. Dray, MA JD
>
> Eric Dray Consulting
>
> 71 Prentiss Street
> <https://www.google.com/maps/search/71+Prentiss+Street++Cambridge,+MA+02140?entry=gmail&source=g>
>
>
> Cambridge, MA 02140
> <https://www.google.com/maps/search/71+Prentiss+Street++Cambridge,+MA+02140?entry=gmail&source=g>
>
>
> 508.566.3797
>
> www.EricDrayConsulting.com <http://www.ericdrayconsulting.com/>
>
>
>
>
> _______________________________________________
> MassHistPres mailing list
> MassHistPres at cs.umb.edu
> http://mailman.cs.umb.edu/listinfo/masshistpres
>
> _______________________________________________
> MassHistPres mailing list
> MassHistPres at cs.umb.edu
> http://mailman.cs.umb.edu/listinfo/masshistpres
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.cs.umb.edu/pipermail/masshistpres/attachments/20200522/b8c6987e/attachment-0001.html>


More information about the MassHistPres mailing list